The CNOOC Lufeng Platform, operated by China National Offshore Oil Corporation (CNOOC), produces over 20,000 barrels of crude oil per day. With such high output, every minute of power disruption leads to significant operational and financial losses.
Due to increasing electricity demand and aging infrastructure, the platform’s original busduct system—provided by a foreign joint venture brand—was no longer adequate. The challenge? The original supplier could only offer new products and was unable to provide on-site upgrade and renovation services.
CNOOC urgently needed a partner who could both manufacture a new busduct system and handle complex offshore renovation—without causing downtime. After evaluating over 20 busduct suppliers, only Ohory Electric (Cao Gong) provided a full turnkey solution.
Replace the existing offshore busduct system with high-reliability equipment
Provide on-site upgrade, renovation, and construction services
Execute the project safely under COVID-19 travel restrictions and isolation protocols
Ensure zero disruption to daily oil production operations
Due to pandemic travel restrictions, Ohory’s engineering team conducted remote site surveys with platform personnel via live video and technical guidance. Using this data, a custom offshore busduct system was engineered to match exact specifications.
Ohory Electric produced high-safety, corrosion-resistant busducts specifically for offshore oil platforms, incorporating:
IP68 sealing
Flame-retardant insulation
Vibration-resistant housing
Stainless steel mounting systems
After 28 days of medical isolation and testing, Ohory’s engineers flew to the platform via helicopter, carrying tools and equipment. In just one month:
The full busduct system was replaced
Aging infrastructure was safely upgraded
The entire system was tested and commissioned successfully
Ohory Electric and the CNOOC on-site team worked together 24/7 during the installation period. Despite weather, logistics, and health protocol challenges, the project was completed ahead of schedule with zero safety incidents.
Shortly after project completion, CNOOC issued an official letter of thanks, commending Ohory Electric for its professionalism, speed, and commitment to quality. This project has since become a benchmark case for offshore electrical system renovation and a symbol of win-win cooperation between Ohory and energy sector clients.
CNOOC Lufeng LF Platform
Panyu FPSO Floating Platform
Lufeng Nuclear Power Station
Feilaixia Hydropower Station
Mawan Thermal Power Plant
Proven track record in offshore oil and gas infrastructure
Specialized in harsh environment power systems
Fully integrated manufacturing + on-site services
Rapid response under emergency or mission-critical conditions
Custom-built solutions for marine, nuclear, and power generation sectors